Prolok 12" and 16"

Prolok 12" and 16" with Concealed Fastening System. The Prolok Panel with its 12 or 16 inch width shows great shadow lines to enhance the overall appearance of any building.

Line Drawing

Line Drawing

 

Flashings


Colours and Gauges
Mouse over the swatch for colour name

24 Gauge

Galvanized Galvalume white white Bone White Regent Grey Stone Grey Charcoal Grey
Black Coffee Brite Red Tile Red Dark Red Title Slate Blue Heron Blue
Melchers Green

26 Gauage

Galvanized Galvalume White white Surf white Bone white regent grey Stone Grey
Charcoal Grey Black Dark Brown Black Coffee Metro Brown Brite Red Dark red
Internation orange Tan Slate Blue Heron Blue Melchers Green Pacific Turquiose Snowdrift white
Tahoe Blue Dark Green Colonial Red Terra Cotta Dark Bronze weatherd copper

29 Gauge

galvanized galvalume brite white ivory sportsman yellow gold Sapphire blue
royal blue brite green turquiose deep water green

*Colours shown are approximations of actual product. Actual samples available on request. Special colours are also available upon request. Colours with a * by the name are Kynar colours and subject to extra charge.

 

Photos

photo1   photo2
 
photo3  

photo4

 

Accessories

 

Brochures

 

Panel Installation - Instruction

panel1 panel2 panel3   Determine which flashings need to be installed prior to roof panels (eave flashings).
  1. Align the female edge of the first panel with the chalk line along the gable end. Allow the roof panel to overhang fascia minimum 1". The panel must be 11/2" down from the ridge.
  2. After the roof panel is properly aligned, screw down the roof panel on the female side; fasten down the panel at the nailing flange. Now install the gable flashings.
  3. Snap the second panel at the seam. Work the seam together from the eave to the ridge. Do not work the seam from the middle to each end.
  4. Fasten down the panel by screwing the flange through the slots. If the slots are not located on the strapping, screw through the flange using the slots as a guide.
  5. Apply panels as shown.
  6. Attach large closures at the top of the panel.
  7. Fasten Z bar over the closures at the top of the panel.

Roof Preparation: Instruction

roof1 roof2   Our products can be used in both new and old construction. We recommend installation over solid substrate. Installation over strapping is also possible. The following steps should be taken to prepare the roof for installation of any roof panel.
  1. Make sure there are no nails or other objects that might puncture the underlayment of roof panels.
  2. Check all details for possible roof penetrations which must be added to the roof prior to panel installation (vented ridge - plumbing stacks).
  3. Cover the roof deck with Nova Seal, overlaying 6". When installing over strapping, run the felt parallel with the metal panels, making sure that the felt is tight.
  4. Snap a chalk line along the gable end where the first panel will be installed. This line should be ½" away from the edge of the roof and square with the eave.

Roof Preparation: Existing Roof

In some cases metal roofing can go over existing roofing. For those roofs use 1x4 strapping on 16" O.C. screwed through to the rafter. (The minimum pitch for Prolok 12 is 2/12 pitch).

  1. Inspect the roof for damage and make repairs.
  2. Secure any warped or loose sheeting.
  3. Remove all moss and debris from roof.
  4. Screw down 1x4 on 16" O.C.

 

Residential Application: Instruction

 

Roofing siding
Gable Trim  

GABLE FLASHING

  1. In some cases you may have to bend the edge of the panel up 1"
  2. Place sealer tape along edge of roof panel in line with the gable flashing flange
  3. Install flashing by firmly pressing flashing onto sealer tape. Fasten with coloured screws
  4. Fasten flashing to panel with screws through the sealer tape

 

Ridge Hip Flashing   RIDGE/HIP FLASHING
  1. Attach the roof panels 1½" down from the ridge
  2. Check the overhang of the roof at fascia min 1"
  3. Attach closures to the roof panels at ridge
  4. Attach z bar over closures and roof panels
  5. Attach the gable flashing
  6. Fasten the ridge cap to z bar with stitch screws
RoofTrans   ROOF TRANSITION
  1. Attach roof panels down from transition
  2. That distance must be lower than the bottom of the upper roof panel
  3. Check overhang of the roof at fascia min 1"
  4. Attach closures to the roof panels at transitions
  5. Attach z bar over closures and roof panel
  6. Fasten transition with nails to roof sheeting
  7. Fasten transition with stitch screws to z bar
  8. Attach sealer tape as shown
  9. Attach uphill panels as shown

 

Roof Trans   VENTED CLOSURE
  1. Decking should be held back 1½" from the ridge
  2. Attach roof panels
  3. Check overhang of the roof at fascia min 1"
  4. Attach vented closures
  5. Attach gable flashing
  6. Fasten ridge cap

 

Vented closure   VENTED CLOSURE
  1. Decking should be held back 1½" from the ridge
  2. Attach roof panels
  3. Check overhang of the roof at fascia min 1"
  4. Attach vented closures
  5. Attach gable flashing
  6. Fasten ridge cap

 

end wall   END WALL
  1. Attach roof panels 1½" down from the end wall flashing
  2. Attach closures to the top of the panel
  3. Attach z bar as shown
  4. Nail end wall flashing to wall
  5. Screw flashing to z bar

 

side wall   SIDE WALL
  1. In some cases you may have to bend edge of panel up 1"
  2. Place sealer tape along edge of roof panel in line with the gable flashing flange
  3. Install flashing by firmly pressing flashing onto sealer tape. Fasten with coloured screws
  4. Fasten flashing to panel with screws through the sealer tape

 

W-Valley   W-VALLEY FLASHING
  1. Starting at the eave trim, place the valley flashing so it overhangs by 1"
  2. Caulk and lap subsequent flashing 6"
  3. Place 2 rows of sealer tape parallel to the valley
  4. Fasten down flashing with roofing nails
  5. Roof panels should start 4" from the center of the valley flashing
  6. In heavy snow areas keep roof panels back 6" to 8" from the center of the valleys

 

Eave   EAVE FLASHING
  1. The eave flashing must be installed before roof panels
  2. Fasten the eave flashing with roofing nails
  3. Roof panels must overhang fascia by 1"

 

Peak Cap   PEAK CAP APPLICATION
  1. Attach roof panels 1" to 1½" down from peak
  2. Attach closures to top of panel
  3. Attach z bar over closures
  4. Screw flashing to the z bar with stitch screws

 

Drip Cap   DRIP CAP
  1. Attach flashing with roofing nails
  2. Drip flashing over some windows and doors may have the color on the other side

 

Outside Corner   OUTSIDE CORNER
  1. Attach J flashing with nails
  2. Some corner flashings may require a J flashing for support

 

Inside Corner   INSIDE CORNER
  1. Attach J flashing with nails
  2. Some corner flashings may require a J flashing for support

 

 