Penticton Water Plant
Project Description
Client: Penticton Water Treatment Plant
Location: Penticton, B.C.
General Contractor: Greyback Construction
Project Completed: July 2009
Project Details
Project Description: The project consisted of three separate phases.
- An addition to the existing building which consisted of liner, insulation, sub-structure and an outer skin of 636. s
- An interior with sub structure into concrete and rigid insulation, with a seal tight outer skin. This phase also consisted of 636 panel canopy complete with soffit.
- The final phase was a new galvanized iron structure which was sealed with liner, insulated with roxul and the outer 636 skin was fastened to a 16 gauge sub-structure.